Week of June 29 – July 3, in plain English
Written by Walkthrough AI — the same digest the owner gets
Generated Thursday, Jul 3 · from 5 job schedules, shop calendar, and 2 open sign-offs
Five packages are in flight worth just shy of a million dollars. Promontory installs next week and is tracking to finish two days early. The one thing costing money right now is the Silver Lake wine wall: the client has sat on Rev C for six days, and the walnut order window closes July 9 — after that the install slides three weeks and the finish room re-sequences. Aerie Point sign-off is due July 11 and protects the September install. Shop capacity is 84% booked through late August, so anything new lands in September unless we add a bench.
Pipeline $996K across 5 jobs2 sign-offs pending · 1 overduePromontory install: 2 days early
One digest, three audiences: the owner sees money and risk, clients see their own job, Isaac sees everything. Nobody has to chase anybody for a status update.
Every job, one board
5 active packages · $996K in flight
Aerie Point Estate
Sign-off
R. Hartley residence · Deer Valley
Full kitchen + butler, library wall, primary closets
$412K
package
Rev B kitchen elevations — client sign-off due Jul 11
Install crew on site Mon–Thu · hardware punch Friday
Silver Lake Chalet
Sign-off
Bergman residence · Silver Lake Village
Walnut wine wall + bar, fireplace surround
$174K
package
Wine wall Rev C sitting with client — 6 days overdue
Overdue sign-off · walnut order window closes Jul 9
Victory Ranch Cabin
Design
Dunlap family · Victory Ranch
Bunk room built-ins, media wall, entry bench
$96K
package
Field measure Jul 8 · AI first-draft set same week
The design queue
Every drawing set, its revision, and exactly where it’s stuck. Sign-offs carry real lead-time deadlines — an unsigned rev can’t quietly stall a shop slot anymore.
Aerie Point Estate — Kitchen + butler elevations · Rev B
Client link sent Jul 1. Reminder auto-sends Jul 8.
Due Jul 11Awaiting sign-off
Silver Lake Chalet — Wine wall + bar · Rev C
Overdue. Walnut slab order window closes Jul 9 — flagged to owner.
Due Jun 27Awaiting sign-off
Victory Ranch Cabin — Bunk room built-ins · Rev A
Drafted from field photos + measure sheet. Isaac red-pens before it goes anywhere.
Due Jul 10AI draft
Aerie Point Estate — Library wall · Rev A
AI draft done overnight. 40 min of markup vs. a day of drafting.
Due Jul 15Isaac review
Old Town Brownstone — Stair screen shop set · Released
Cutlist + CNC files generated from the signed set.
Released to shop
How drawings happen here
A master carpenter shouldn’t spend his hours being a mediocre AutoCAD operator. AI does the drafting; Isaac does the judgment.
1
Measure & capture
Field measure, photos, and a voice walkthrough from the job site. No drafting yet.
2
AI drafts the set
AI turns the measure into DWG elevations, sections, and a plan overnight — Isaac never starts from a blank AutoCAD screen.
3
Isaac red-pens
The craftsman pass: joinery, reveals, grain direction, what will actually build well. Markups regenerate the set.
4
Client signs off
Client gets a plain-English page, not a drawing dump. Approval is logged, dated, and tied to the rev.
5
Shop set releases
Signed rev auto-generates shop drawings, cutlist, and hardware order. Fabrication can't start on an unsigned rev.
The signed rev is the source of truth: it generates the shop set, the cutlist, and the hardware order. Nothing gets built off a drawing the client hasn’t approved.